Concurrent Engineering Definition:

Concurrent Engineering Notes:

The traditional way of doing work was to perform the tasks in series i.e. the next step in the process starts when the previous step is completed. However, there are many situations in which the tasks can be performed simultaneously. Keeping this in mind, the way of doing work simultaneously or in parallel is called concurrent engineering. Concurrent engineering is also called simultaneous engineering. The traditional concept has a severe disadvantage of increased rework cost. It means that when the product moves through different stages and at a later stage, it is revealed that the product has some issues whose origin is a previous stage, rework must be done. But the concurrent engineering enables to identify the issue earlier in the process as all the product development stages are integrated and work simultaneously.

Keep Learning with Project Management Notes

What is Seller Performance Evaluation Documentation?

Even if the seller proposal confirms that the seller is capable of performing the required work, still the seller's performance ...

What is Coordinating?

Directing subordinates (project team members) is an important function of management. A project manager must be able to effectively direct ...

What is Documentation Management?

Due to the increase in technology, project management has also been switched to the use of computer softwares. Project management ...

What is Control Chart?

Control charts are also called process charts or process control charts. These are used to monitor a process in order ...

What is Reporting Period?

When a contract is made with the contractor and the project starts, it is important to check whether the actual ...

What is Event?

The term event is used in the activity on arrow format of the network diagram. In this format, a circles ...